KWS Exceeds Customer Expectations with On Time Submittal of Designs and Drawings
As part of customer contracts, KWS provides a specific date for submittal of drawings for approval. For the past 12 months and counting, KWS has provided all drawing submittals ahead of the specific date promised.
Bill Mecke, KWS President states –
“KWS lead-times for drawings and manufacturing are typically less than 1/2 of any of our competitors. With 11 degreed Mechanical Engineers on our staff, KWS can and will meet any customer requirements. KWS has more degreed engineers than all of our competitors combined. We have the people and the expertise to exceed customer expectations.”
“Our commitment to customer satisfaction for engineered work begins with providing excellent designs and drawings. By using design automation and AI, KWS has reduced the engineering cycle time by a factor of 10. Design automation and 3D modeling have reduced drawing time from days to minutes. The technology that we have developed at KWS cannot be matched by any other company in our market.”
KWS has grown over 1,000-percent in the last 10 years to become the largest screw conveyor manufacturer in North America. With a strong focus on designing and manufacturing high quality products along with excellent service and the shortest lead times in the industry, KWS now has over 200,000 installations worldwide.